Since 1981 Veronesi Building & Remodeling, Inc. has built a solid reputation as a reliable construction firm that can meet the needs and overcome the challenges of innumerable building endeavors. From custom home remodeling to full-scale industrial and commercial complexes, the State College region teems with VBR projects.
Featured Commercial Projects
|
 |
Aaron Plaza
Shopping plaza; new construction |
|
|
|
|
 |
Abundance Wealth
8,000 sq. ft. office building |
|
|
|
|
 |
Brungo Family Dentistry
Dental office fit-out |
|
|
|
|
| |
 |
Centre Furnace Mansion Ice House
Restoration |
|
|
|
|
 |
CMSA
8,300 sq.ft. medical facility fit-out
|
|
|
|
|
 |
Cozy Thai
restaurant fit-out |
|
|
|
|
| |
 |
D. P. Dough
Pizza restaurant |
|
|
|
|
 |
Hope For Kids
New construction of a day care center. |
|
|
|
|
 |
Kohl Building
Warehouse distribution center with offices and showroom |
|
|
|
|
| |
 |
Maki Yaki
VBR served as the construction manager/general contractor for the fit-out of this 1,400 sf restaurant space. The project included the construction of a commercial kitchen, dining area and restroom facilities. Finishes include tile flooring, dramatic paint scheme, expanded metal ceiling and modern pendent lighting.
The project was completed in time to be open for the arrival of students for the fall 2008 semester.
The project was completed on time and on budget. |
|
|
|
|
 |
Minitab, Inc. - Addition
Addition of 53,000 sf of new office space to existing building. Atrium with waterfall, upscale offices, conference room and kitchen. Basement level includes work-out gym, yoga room, kitchen and locker rooms. Project was completed on time and on budget. |
|
|
|
|
 |
Minitab Natatorium
Natatorium with a 5 lane olympic-size pool and locker rooms.
Project was completed on time and on budget. |
|
|
|
|
| |
 |
NDulge
Cupcake bakery in downtown State College. State of the art equipment was installed, custom paint and hardwood flooring are among the many upscale ammeneties of this project. The project was completed one week in advance of the quatanteed completion date and on budget. |
|
|
|
|
 |
One on One Fitness Consultants
Tenant fit-out at Aaron Plaza |
|
|
|
|
 |
Paris Companies - Health Care Facility
VBR served as the construction manager for the construction of this 50,000sf commercial laundry facility. The project included tilt up precast wall construction, structural steel roof support and an EPDM roofing system. The building was fit-out with a state of the art commercial laundry processing system with overhead conveyance system. Exterior loading docks and an interior (2) story office and business center were included.
Project was constructed on an extremely fast tracked schedule as the Owner was losing money for every day the facility was not processing laundry.
Project was completed on time and on budget.
|
|
|
|
|
| |
 |
Penn State Hotel & Conference Center
VBR served as the construction manager for the renovations to this 50,000sf hotel and conference center. The project included demolition of existing flooring, wall covering and millwork details. New carpet, wall coverings, and millwork were installed. Renovations included break areas including wood wall panels, stone masonry elevations, granite counter tops and custom millwork.
Project was closely coordinated with the conference center as the facility was open for business the entire time renovations were being completed.
Project was completed on time and on budget.
|
|
|
|
|
 |
Curtain Road Bus Shelters
Project included the construction of (2) free standing bus shelters. Shelter frame is structural steel with standing seam roofing and metal panel soffit material. Lower structural frame is clad in brick and lime. Windscreens include clear anodized aluminum glazed frames.
VBR/Buchart Horn Basco Associates redesigned the structural frame to allow the shelters to be constructed faster and meet the time frame.
Project was completed on time. |
|
|
|
|
 |
OPP Central Distribution Loading Dock
VBR served as the general contractor for the demolition of existing and the construction of a new loading dock facility. Project included removing the existing dock surface and overhead structure. New loading bays with dock levelers were installed. New overhead structure, EPDM roofing system and metal panel soffit panels were installed. Lighting and safety rails completed the project scope.
Project was completed on time and on budget.
|
|
|
|
|
| |
 |
RedLine Speed Shine
New car wash constructed from white split-face block trimmed with red metal standing seam. Six self-wash bays, 6 outside vac islands, 1 automatic touchless bay, 103' automated wash tunnel, 4 detail bays and 2 dog wash bays. State of the art eqipment and re-claim water system installed, auto card readers for the tunnel and touchless bays, two large mechanical rooms, office/sales area, 2 public restooms and a lounge/viewing area to the tunnel and detail bays. |
|
|
|
|
 |
Reese Engineering
Upscale corporate office building. |
|
|
|
|
 |
Restek Corporation
Varco Pruden pre-engineered addition. |
|
|
|
|
| |
 |
Addition
Varco Pruden Building. Adding new classrooms and bathrooms. |
|
|
|
|
 |
Park Forest Middle School Gym Renovation
VBR served as the construction manager for the renovations to this 6,000sf gymnasium. The project included removing the existing rubber flooring system and all ceiling and floor mounted athletic equipment. A new chair lift was installed to the upper stage level within the gym and masonry restoration completed. A new rubber floor surface was installed along with new basketball hoops, bleachers, and overhead dividing curtain.
Project was completed over summer break and was completed in time for the return of students for the fall start of school.
Project was completed on time and on budget.
|
|
|
|
|
 |
De-Icing Facility
Constructed a Varco-Pruden Pre-engineerd Steel Building. This Building will
house de-icing equipment and supplies. |
|
|
|
|
| |
 |
Original Waffle Shop North
Remodel restaurant |
|
|
|
|
Featured Residential Projects
|
 |
Axt
High-end master bedroom and bathroom addition. |
|
|
|
|
 |
Curt & Tracy Bryan
New living room, office and 3 car garage |
|
|
|
|
| |
 |
Cheesebrough
Remodel of breezeway to sunroom |
|
|
|
|
 |
Clapp
Remodel basement, upstairs bath, install fireplace and paint interior of home. |
|
|
|
|
 |
Ford/Cook
Addition to home of dining room, kitchen and breakfast tower. |
|
|
|
|
| |
 |
Foust New Home
New construction of 3 bedroom, 4.5 bath home on 1.5 acre lot located in Opequan Development. Grand Stairway, two-story gas fireplace made of El Dorado Stone, granite countertops, hardwood and tile flooring throughout. Granite shower stall in master bath, 5 walk-in closets. Pantry off the kitchen. Walk-out basement, maintenance free exterior constructed from El Dorado Stone foundation, vinyl siding, Pella Designer Series windows and doors. Covered front porch and covered back deck are constructed of maintenance free composite decking. |
|
|
|
|
 |
Oppy/Gordon
Metal spiral staircase
|
|
|
|
|
 |
Schreiber, Mac
Dining Room, Kitchen, Master Bedroom, Master Bathroom & Deck |
|
|
|
|
| |
 |
Sieg
Remodel of dining room and kitchen, complete electrical upgrades |
|
|
|
|